    {"personrec":{"StatusID":1,"PersStatus":null,"Status":"Valid","PersID":10479,"PersName":"Bulckaen, Dirk","PublicFlag":1,"CheckedFlag":1,"Surname":"Bulckaen","Firstname":"Dirk","Initials":"D.","AddressedAs":null,"Function":null,"DateLastModified":{"date":"2023-05-02 10:08:18.393000","timezone_type":1,"timezone":"+00:00"},"PersTitle":"Mr","PersStatusID":null,"AbstractEnglish":null,"AbstractOtherLang":null,"AbstractLangCode":null,"AbstractLangID":null,"AutID":58802,"ND":"2005-05-19","UD":"2014-12-10"},"loaninfo":null,"pictures":[],"institutes":[{"instituterec":{"OrderNr":1,"Acronym":"IMDC","ENFunction":"Director","InsIDtmp":777,"OrigNameLangCode":null,"OrigNameLangID":null,"FullOrigName":null,"InsID":777,"Function":"Director","BeginDay":null,"BeginMonth":null,"BeginYear":null,"Begindate":"","Enddate":"","PIAdrID":127544,"AdrID":111828,"Line1":null,"Line2":null,"Line3":null,"Line4":null,"Phone":"+32-(0)3-270 92 77","GSM":null,"Email":"dirk.bulckaen@imdc.be","EnvName":"Belgium","EncAddress":"Van Immerseelstraat 66, 2018 Antwerpen, Belgium","FullStandardName":"International Marine & Dredging Consultants NV","DirectorFlag":null,"MarineSciFlag":null,"SpecializedFlag":null},"parent":null,"institutes":null,"references":null,"conferences":null,"datasets":null,"persons":null,"pastpers":null,"subpers":null,"projects":null,"urls":null,"pictures":null,"published":null,"affrefs":null,"collections":null,"thesterms":null,"taxterms":null,"geoterms":null,"thestermsFRIS":null,"nXtins":null,"previns":null,"spcols":null,"resmessage":"no id specified","complete":0,"participantrec":null,"peerrevs":null,"urlmaps":null}],"pastins":[],"projects":[{"ProID":1592,"Acronym":null,"Progress":"Completed","StandardTitle":"Complete exploration of the Scheldt bassin for an update of the Sigmaplan","BeginYear":2001,"EndYear":2003},{"ProID":1628,"Acronym":null,"Progress":"Completed","StandardTitle":"Masterplan Antwerpen, Oosterweelverbinding :conceptuele modellering","BeginYear":2004,"EndYear":2004},{"ProID":1608,"Acronym":null,"Progress":"Completed","StandardTitle":"Social cost-benefit analysis of the Sigmaplan","BeginYear":2003,"EndYear":2005},{"ProID":1599,"Acronym":null,"Progress":"Completed","StandardTitle":"Strategical MER development draft Scheldt estuary 2010","BeginYear":2003,"EndYear":2004},{"ProID":1625,"Acronym":null,"Progress":"Completed","StandardTitle":"Voorstudie mogelijkheden om het getij toe te laten in achterhaven van Zeebrugge","BeginYear":2001,"EndYear":2001}],"datasets":null,"references":{"A1":[{"BRefID":208297,"RR":"<b>Broekx, S.; Smets, S.; Liekens, I.; Bulckaen, D.; De Nocker, L.</b> (2011). Designing a long-term flood risk management plan for the Scheldt estuary using a risk-based approach. <i>Nat. Hazards 57(2)</i>: 245-266. <a href=\"http://dx.doi.org/10.1007/s11069-010-9610-x\" target=\"_blank\">dx.doi.org/10.1007/s11069-010-9610-x</a>","AutID":156277,"MonDate":null,"AnaDate":2011,"PeerRev":1,"outputType":"1_A1","OpenAcc":0}],"BookChap":[{"BRefID":113489,"RR":"<b>Graré, W.; Bulckaen, D.</b> (2003). Het Sigmamodel: een hydrodynamisch 1D model Mike11 van de Westerschelde en het Zeescheldebekken. Samenvattende beschrijving, <b><i>in</i></b>: Waterbouwkundig Laboratorium en Hydrologisch Onderzoek (Ed.) <i>Colloquium: Numerieke oppervlaktewater modellering, mogelijkheden en beperkingen, Antwerpen 23-24 oktober 2003.</i> pp. 1-35","AutID":58802,"MonDate":null,"AnaDate":2003,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1}],"Report":[{"BRefID":96693,"RR":"<b>Blanckaert, J.</b> (2005). Sigmaplan. Maatschappelijke KostenBatenAnalyse: deelopdracht 1. Faserapport 6: probabilistische aanpak. Versie 2.0. Waterwegen en Zeekanaal NV. Afdeling Zeeschelde: Antwerpen.  VIII, 38 + maps pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96665,"RR":"<b>Bulckaen, D.; De Nocker, L.; Broekx, S.; Smets, S.</b> (2005). Sigmaplan. Maatschappelijke Kosten-BatenAnalyse: Geïntegreerd rapport deelopdrachten 1 en 3. Faserapport 3: Maatschappelijke Kosten-batenanalyse van de planalternatieven. Versie 2.0. Waterwegen en Zeekanaal NV. Afdeling Zeeschelde: Antwerpen.  VI, 52 pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96702,"RR":"<b>Bulckaen, D.; De Nocker, L.; Gauderis, J.</b> (2005). Sigmaplan. Maatschappelijke KostenBatenAnalyse: syntheserapport. Versie 1.0. Waterwegen en Zeekanaal NV. Afdeling Zeeschelde: Antwerpen.  VI, 33 + 5 p. Appendices pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":1},{"BRefID":106557,"RR":"<b>Couderé, K.; Vincke, J.; Nachtergaele, L.; Van den Bergh, E.; Dauwe, W.; Bulckaen, D.; Gauderis, J.</b> (2005). Geactualiseerd Sigmaplan voor veiligheid en natuurlijkheid in het bekken van de Zeeschelde: synthesenota. Waterwegen & Zeekanaal NV: Antwerpen. II, 74 pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96661,"RR":"<b>Gauderis, J.</b> (2005). Sigmaplan. Maatschappelijke KostenBatenAnalyse: overzicht van rapporten - Leeswijzer. Versie 1.1. Projectconsortium MKBA Sigmaplan. Resource Analysis: Antwerpen.  5 pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96691,"RR":"<b>Smets, S.; Broekx, S.; Bulckaen, D.; De Nocker, L.</b> (2005). Sigmaplan. Maatschappelijke KostenBatenAnalyse: geïntegreerd rapport deelopdracht 1 en 3. Faserapport 4: Maatschappelijke Kosten-Batenanalyse voor de actualisatie van het Sigmaplan. Lokale optimalisatie van dijkverhoging en overstromingsgebieden. Versie 2.0. Projectconsortium MKBA Sigmaplan. Resource Analysis: Antwerpen.  XXII, 220 pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96664,"RR":"<b>Smets, S.; Pereira, F.; Bulckaen, D.</b> (2005). Sigmaplan. Maatschappelijke KostenBatenAnalyse: deelopdracht 1. Faserapport 2: Nulalternatief: waterstanden, overstromingskaarten, schade, slachtoffers en risico. Versie 2.0. Projectconsortium MKBA Sigmaplan. Resource Analysis: Antwerpen.  IX, 38 + appendices pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96692,"RR":"<b>Vanderkimpen, P.; Janssen, S.; Smets, S.; Broekx, S.; Bulckaen, D.; De Nocker, L.</b> (2005). Sigmaplan. Maatschappelijke KostenBatenAnalyse: geïntegreerd rapport deelopdracht 1 en 3. Faserapport 5: Maatschappelijke Kosten-Batenanalyse voor de actualisatie van het Sigmaplan. Gevoeligheidsanalyses voor de optimale oplossing. Projectconsortium MKBA Sigmaplan. Resource Analysis: Antwerpen.  VI, 74 pp.","AutID":58802,"MonDate":2005,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":110399,"RR":"<b>Toro, F.</b> (2004). Masterplan Antwerpen Oosterweelverbinding tunnel: studierapport 2D Hydrodynamic model of the Scheldt: model set-up and calibration. Versie A. Beheersmaatschappij Antwerpen Mobiel (BAM): Antwerpen.  III, 37 pp.","AutID":58802,"MonDate":2004,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":110403,"RR":"<b>Toro, F.</b> (2004). Sediment transport model: model set-up and scenarios during the construction of the tunnel. Versie A. Beheersmaatschappij Antwerpen Mobiel (BAM): Antwerpen.  III, 17 pp.","AutID":58802,"MonDate":2004,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":110407,"RR":"<b>Toro, F.</b> (2004). 2D Hydrodynamic model of the Scheldt: model scenarios during the construction of the tunnel. Versie A. Beheersmaatschappij Antwerpen Mobiel (BAM): Antwerpen.  III, 22 pp.","AutID":58802,"MonDate":2004,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":96662,"RR":"<b>Bulckaen, D.; Blanckaert, J.; Smets, S.</b> (2003). Sigmaplan. Maatschappelijke KostenBatenAnalyse: deelopdracht 1. Startnota. Versie 1.0. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: Antwerpen.  VI, 49 pp.","AutID":58802,"MonDate":2003,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0}],"OtherRef":[{"BRefID":435676,"RR":"<b>Dauwe, W.; Bulckaen, D.; Borrows, P.; Lavery, S.; Hill, R.; Birchfield, C.; Grant, O.; Doherty, A.; Tiggeloven, W.; Kreuwel, H.; Luijt, K.; Löw, M.; Röttcher, K.; Tönsmann, F.; Bruns, D.; Kuhne, B.</b> (2006). Floodscape at the interface: floodscape final report december 2006. Dienst Landelijk Gebied/Ministerie van de Vlaamse Gemeenschap/Environment Agency/Waterwegen en Zeekanaal NV, Sea Scheldt Department/Hessisches Ministerium For Umwelt, Landlichen Raum Und Verbraucherschutz: [s.l.]. 64 pp.","AutID":58802,"MonDate":2006,"AnaDate":null,"PeerRev":0,"outputType":"8_OtherRef","OpenAcc":0},{"BRefID":119842,"RR":"<b>De Nocker, L.; Broekx, S.; Liekens, I.; Bulckaen, D.; Smets, S.; Gauderis, J.; Dauwe, W.; Brebbia, C.A.; Popov, V.</b> (2006). Cost-benefit analysis to select the optimal flood protection strategy along the Scheldt. <i>Risk analysis v: simulation and hazard mitigation 91</i>: 271-277. <a href=\"https://dx.doi.org/10.2495/RISK060261\" target=\"_blank\">https://dx.doi.org/10.2495/RISK060261</a>","AutID":58802,"MonDate":null,"AnaDate":2006,"PeerRev":0,"outputType":"8_OtherRef","OpenAcc":0},{"BRefID":72320,"RR":"<b>Bulckaen, D.</b> (1991). Uitbreiding van de hydro-elektrische productie in het bekken van de Cho-Shui rivier (Taiwan). <i>Water 10(57)</i>: 66-68","AutID":58802,"MonDate":null,"AnaDate":1991,"PeerRev":0,"outputType":"8_OtherRef","OpenAcc":0},{"BRefID":72318,"RR":"<b>Zwaenepoel, F.; Bulckaen, D.</b> (1991). De stuwdam van Manantali in Mali. <i>Water 10(57)</i>: 60-63","AutID":58802,"MonDate":null,"AnaDate":1991,"PeerRev":0,"outputType":"8_OtherRef","OpenAcc":0}]},"urls":null,"spcols":[{"SpColID":45,"SpName":"Safety","ShortName":"Veiligheid"},{"SpColID":27,"SpName":"ScheldeMonitor","ShortName":"scheldemonitor"}],"thesterms":null,"taxterms":null,"pub":1,"newses":{"SesID":17402,"LoginName":"VLIZ2000\\Kris","LoginID":18,"DD":"2005-05-19"},"updses":{"SesID":73630,"LoginName":"VLIZ2000\\ruthv","LoginID":79,"DD":"2014-12-10"},"urlmaps":[],"resmessage":"no id specified","complete":1}
