    {"personrec":{"StatusID":1,"PersStatus":null,"Status":"Valid","PersID":14808,"PersName":"Vercruysse, Jeroen","PublicFlag":1,"CheckedFlag":1,"Surname":"Vercruysse","Firstname":"Jeroen","Initials":"J.B.","AddressedAs":null,"Function":null,"DateLastModified":{"date":"2026-06-05 01:37:24.580000","timezone_type":1,"timezone":"+00:00"},"PersTitle":"Eng.","PersStatusID":null,"AbstractEnglish":null,"AbstractOtherLang":null,"AbstractLangCode":null,"AbstractLangID":null,"AutID":73587,"ND":"2007-06-11","UD":"2025-10-13","ORCID":"0009-0002-1134-4549"},"loaninfo":null,"pictures":[],"institutes":[{"instituterec":{"OrderNr":1,"Acronym":"WL","ENFunction":null,"InsIDtmp":116,"OrigNameLangCode":"en","OrigNameLangID":15,"FullOrigName":"Flemish Government; Mobility and Public Works; Flemish Ministry of Mobility and Public Works; Department of Mobility and Public Works; Flanders Hydraulics","InsID":116,"Function":null,"BeginDay":15,"BeginMonth":3,"BeginYear":2007,"Begindate":"15/3/2007","Enddate":"","PIAdrID":171127,"AdrID":111176,"Line1":null,"Line2":null,"Line3":null,"Line4":null,"Phone":null,"GSM":null,"Email":null,"EnvName":"Belgium","EncAddress":"Berchemlei 115, 2140 Antwerpen (Borgerhout), Belgium","FullStandardName":"Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Waterbouwkundig Laboratorium","DirectorFlag":null,"MarineSciFlag":null,"SpecializedFlag":null},"parent":null,"institutes":null,"references":null,"conferences":null,"datasets":null,"persons":null,"pastpers":null,"subpers":null,"projects":null,"urls":null,"pictures":null,"published":null,"affrefs":null,"collections":null,"thesterms":null,"taxterms":null,"geoterms":null,"thestermsFRIS":null,"nXtins":null,"previns":null,"spcols":null,"resmessage":"no id specified","complete":0,"participantrec":null,"peerrevs":null,"urlmaps":null},{"instituterec":{"OrderNr":3,"Acronym":"WATCON","ENFunction":"Researcher","InsIDtmp":15174,"OrigNameLangCode":null,"OrigNameLangID":null,"FullOrigName":null,"InsID":15174,"Function":"Researcher","BeginDay":null,"BeginMonth":null,"BeginYear":null,"Begindate":"","Enddate":"","PIAdrID":171129,"AdrID":null,"Line1":null,"Line2":null,"Line3":null,"Line4":null,"Phone":null,"GSM":null,"Email":"jeroen.vercruysse@mow.vlaanderen.be","EnvName":null,"EncAddress":"","FullStandardName":"Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Waterbouwkundig Laboratorium; Waterbouwkundige Constructies","DirectorFlag":null,"MarineSciFlag":null,"SpecializedFlag":null},"parent":null,"institutes":null,"references":null,"conferences":null,"datasets":null,"persons":null,"pastpers":null,"subpers":null,"projects":null,"urls":null,"pictures":null,"published":null,"affrefs":null,"collections":null,"thesterms":null,"taxterms":null,"geoterms":null,"thestermsFRIS":null,"nXtins":null,"previns":null,"spcols":null,"resmessage":"no id specified","complete":0,"participantrec":null,"peerrevs":null,"urlmaps":null}],"pastins":[{"instituterec":{"InsID":790,"FullOrigName":"Vrije Universiteit Brussel; Faculty of Engineering; Department of Hydrology and Hydraulic Engineering","Acronym":"HYDR","Function":null,"BeginDay":null,"BeginMonth":null,"BeginYear":null,"EndDay":null,"EndMonth":null,"EndYear":null,"Notes":null,"Line1":null,"Line2":null,"Line3":null,"Line4":null,"Phone":null,"GSM":null,"Email":null,"FullStandardName":"Vrije Universiteit Brussel; Faculteit Toegepaste Wetenschappen; Vakgroep Hydrologie en Waterbouwkunde"},"parent":null,"institutes":null,"references":null,"conferences":null,"datasets":null,"persons":null,"pastpers":null,"subpers":null,"projects":null,"urls":null,"pictures":null,"published":null,"affrefs":null,"collections":null,"thesterms":null,"taxterms":null,"geoterms":null,"thestermsFRIS":null,"nXtins":null,"previns":null,"spcols":null,"resmessage":"no id specified","complete":0,"participantrec":null,"peerrevs":null,"urlmaps":null}],"projects":[{"ProID":5133,"Acronym":null,"Progress":"In Progress","StandardTitle":"\tSchaalmodelonderzoek energiedissipatiestructuur overloopdijk","BeginYear":2018,"EndYear":null},{"ProID":5545,"Acronym":null,"Progress":"Completed","StandardTitle":"A1-paper resultaten Polder2Cs","BeginYear":2024,"EndYear":2025},{"ProID":5402,"Acronym":null,"Progress":"Completed","StandardTitle":"Advies breuksteensorteringen binnen Sigmaplan","BeginYear":2021,"EndYear":2024},{"ProID":5561,"Acronym":null,"Progress":"Completed","StandardTitle":"Advies brugkelder Van Cauwelaertsluis","BeginYear":2024,"EndYear":2025},{"ProID":5429,"Acronym":null,"Progress":"Completed","StandardTitle":"Afsluitconstructie vispassage Oudenaarde","BeginYear":2017,"EndYear":2024},{"ProID":5126,"Acronym":null,"Progress":"Completed","StandardTitle":"Afstemming Xperta-ondersteuning Nieuwe Sluis Zeebrugge","BeginYear":2020,"EndYear":2022},{"ProID":5408,"Acronym":null,"Progress":"Completed","StandardTitle":"Bepaling hydraulische belasting op droogzetkuip over rails sluis Wintam","BeginYear":2024,"EndYear":2024},{"ProID":5037,"Acronym":null,"Progress":"Completed","StandardTitle":"Complex project nieuwe sluis Zeebrugge - hydraulisch ontwerp","BeginYear":2019,"EndYear":2020},{"ProID":5207,"Acronym":null,"Progress":"Completed","StandardTitle":"Complex project nieuwe sluis Zeebrugge - hydraulisch ontwerp nivelleersysteem","BeginYear":2020,"EndYear":2022},{"ProID":4982,"Acronym":null,"Progress":"Completed","StandardTitle":"Densiteitsmetingen achterhaven Zeebrugge","BeginYear":2018,"EndYear":2019},{"ProID":5220,"Acronym":null,"Progress":"Completed","StandardTitle":"Energie dissipatie structuur op omloopriool in Lanaken en Neerharen sluis","BeginYear":2021,"EndYear":2022},{"ProID":4915,"Acronym":null,"Progress":"Completed","StandardTitle":"Gecombineerde in- en uitwateringsconstructie Bergenmeersen - meting en analyse terugslagklep","BeginYear":2016,"EndYear":2019},{"ProID":4152,"Acronym":null,"Progress":"Completed","StandardTitle":"Gecombineerde in- en uitwateringsstructuren GGG","BeginYear":2011,"EndYear":2020},{"ProID":5203,"Acronym":null,"Progress":"Completed","StandardTitle":"Geotextiel - werkgroep COPRO PTV829","BeginYear":2018,"EndYear":2022},{"ProID":4947,"Acronym":null,"Progress":"Completed","StandardTitle":"GGG Bovenzanden: dimensionering in- en uitwateringssluizen","BeginYear":2018,"EndYear":2019},{"ProID":4704,"Acronym":null,"Progress":"In Progress","StandardTitle":"GGG Doelpolder - gecombineerde in- en uitwateringsconstructie - schaalmodelproeven","BeginYear":2014,"EndYear":null},{"ProID":5168,"Acronym":null,"Progress":"Completed","StandardTitle":"GOG/GGG Wal Zwijn - advies in- en uitwateringsconstructie","BeginYear":2020,"EndYear":2022},{"ProID":5224,"Acronym":null,"Progress":"Completed","StandardTitle":"GOG/GGG Wal Zwijn - ontwerp dissipatiegracht overloopdijk","BeginYear":2021,"EndYear":2022},{"ProID":4929,"Acronym":null,"Progress":"Completed","StandardTitle":"Haven van Antwerpen - Royerssluis voorstudie nivelleersyteem met woelkelder","BeginYear":2018,"EndYear":2018},{"ProID":5447,"Acronym":null,"Progress":"Completed","StandardTitle":"Hydraulische evaluatie vispassage Kerkhove","BeginYear":2022,"EndYear":2024},{"ProID":5134,"Acronym":null,"Progress":"Completed","StandardTitle":"Interregproject POLDER2C's","BeginYear":2018,"EndYear":2023},{"ProID":5121,"Acronym":null,"Progress":"Completed","StandardTitle":"kanaal Dessel Schoten - studie afvoerkoker","BeginYear":2019,"EndYear":2021},{"ProID":5132,"Acronym":null,"Progress":"Completed","StandardTitle":"Kanaal Roeselare Leie - renovatie sluis Ooigem - optimalisatie openingswet","BeginYear":2021,"EndYear":2022},{"ProID":4746,"Acronym":null,"Progress":"Completed","StandardTitle":"Kieldrechtsluis - meting overvulling","BeginYear":2016,"EndYear":2017},{"ProID":4794,"Acronym":null,"Progress":"Completed","StandardTitle":"Kieldrechtsluis - simulatie overvulling","BeginYear":2017,"EndYear":2017},{"ProID":5198,"Acronym":null,"Progress":"Completed","StandardTitle":"Literatuurstudie over vuilroosters","BeginYear":2021,"EndYear":2022},{"ProID":5572,"Acronym":null,"Progress":"Completed","StandardTitle":"LSPIV voor meten stroompatronen","BeginYear":2021,"EndYear":2026},{"ProID":5436,"Acronym":null,"Progress":"Completed","StandardTitle":"Meettechniek positiebepaling schip in sluis","BeginYear":2019,"EndYear":2025},{"ProID":5605,"Acronym":null,"Progress":"In Progress","StandardTitle":"Monitoring wateruitwisseling breuksteenberm Leie - metingen (BUP)","BeginYear":2025,"EndYear":2026},{"ProID":4865,"Acronym":null,"Progress":"Completed","StandardTitle":"Nieuwe sluis Aalst - optimalisatie aanstroming nivelleeropeningen","BeginYear":2017,"EndYear":2018},{"ProID":4885,"Acronym":null,"Progress":"Completed","StandardTitle":"Nieuwe sluis Aalst: opstellen openingswet nivelleersysteem","BeginYear":2018,"EndYear":2018},{"ProID":4768,"Acronym":null,"Progress":"Completed","StandardTitle":"Nieuwe sluis Sint Baafs Vijve - schaalmodelproeven nivelleeropening","BeginYear":2016,"EndYear":2018},{"ProID":5423,"Acronym":null,"Progress":"Completed","StandardTitle":"On the accurate resolution of hydraulic jumps in OpenFOAM","BeginYear":2020,"EndYear":2024},{"ProID":5273,"Acronym":null,"Progress":"Completed","StandardTitle":"Ondersteuning Nieuwe Sluis Zeebrugge continued","BeginYear":2022,"EndYear":2025},{"ProID":4633,"Acronym":null,"Progress":"Completed","StandardTitle":"Onderzoek naar stroming rond breekbalken bij nivelleren van sluizen via openingen in de deuren","BeginYear":2014,"EndYear":2020},{"ProID":4758,"Acronym":null,"Progress":"Completed","StandardTitle":"Ontwerp nivelleersysteem Royersluis: aanvullende simulaties","BeginYear":2017,"EndYear":201},{"ProID":5087,"Acronym":null,"Progress":"In Progress","StandardTitle":"Ontwerp vispassage Sint-Baafs-Vijve","BeginYear":2015,"EndYear":null},{"ProID":5444,"Acronym":null,"Progress":"Progress not set","StandardTitle":"Opstellen bestekvoorwaarden voor terugslagkleppen","BeginYear":2019,"EndYear":2024},{"ProID":5384,"Acronym":null,"Progress":"Completed","StandardTitle":"Optimalisatie openingswet Vandammesluis","BeginYear":2023,"EndYear":2024},{"ProID":5405,"Acronym":null,"Progress":"Completed","StandardTitle":"POLDER2C's uitvoeren dijkbekledingsproeven","BeginYear":2020,"EndYear":2025},{"ProID":4640,"Acronym":null,"Progress":"Completed","StandardTitle":"Schaalmodelstudie vispassage Denderleeuw","BeginYear":2014,"EndYear":2025},{"ProID":4779,"Acronym":null,"Progress":"Completed","StandardTitle":"SHIP - voorontwerp nivelleersysteem met omloopriolen","BeginYear":2015,"EndYear":2017},{"ProID":4326,"Acronym":null,"Progress":"Completed","StandardTitle":"Sluis Zemst - rapportage schaalmodelstudie","BeginYear":2012,"EndYear":2018},{"ProID":4962,"Acronym":null,"Progress":"Completed","StandardTitle":"Stuwsluis Denderleeuw - bodembescherming","BeginYear":2018,"EndYear":2019},{"ProID":5028,"Acronym":null,"Progress":"Completed","StandardTitle":"Uitwatering Galgenweel","BeginYear":2019,"EndYear":2020},{"ProID":5008,"Acronym":null,"Progress":"Completed","StandardTitle":"Verdere ontwikkeling programma vul_sluis","BeginYear":2015,"EndYear":2025},{"ProID":5567,"Acronym":null,"Progress":"In Progress","StandardTitle":"Vispassage Aalst","BeginYear":2024,"EndYear":2026},{"ProID":5374,"Acronym":null,"Progress":"Completed","StandardTitle":"Vlassenbroek Ontwerp Dissipatiegracht","BeginYear":2023,"EndYear":2024}],"datasets":[{"DasID":8933,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Processed data of overflow tests executed in February and March 2021 in the Hedwige and Prosperpolder [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's - Processed data of overflow tests executed in February and March 2021 in the Hedwige and Prosperpolder","DasType":null},{"DasID":8930,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Processed data of overflow tests executed in November 2020 in the Hedwige and Prosperpolder [Dataset]. Flanders Hydraulics","Title":"Interreg Polder2C's - Processed data of overflow tests executed in November 2020 in the Hedwige and Prosperpolder","DasType":null},{"DasID":8935,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Processed data of overflow tests executed in November and December 2021 in the Hedwige and Prosperpolder [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's - Processed data of overflow tests executed in November and December 2021 in the Hedwige and Prosperpolder","DasType":null},{"DasID":8936,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Raw data of LSPIV and LIDAR-measurements executed during wave overtopping tests in January and February 2022 in the Hedwige and Prosperpolder. [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's - Raw data of LSPIV and LIDAR-measurementes executed during wave overtopping tests in January and February 2022 in the Hedwige and Prosperpolder","DasType":"Data"},{"DasID":8932,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Raw data of overflow tests executed in February and March 2021 in the Hedwige and Prosperpolder [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's - Raw data of overflow tests executed in February and March 2021 in the Hedwige and Prosperpolder","DasType":null},{"DasID":8928,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Raw data of overflow tests executed in November 2020 in the Hedwige and Prosperpolder [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's - Raw data of overflow tests executed in November 2020 in the Hedwige and Prosperpolder","DasType":null},{"DasID":8934,"Acronym":null,"Citation":"Verelst, K.; Vercruysse, J.; López Castaño, S.; Depreiter, D. Peeters, P. (2025). INTERREG Polder2Cs - Raw data of overflow tests executed in November and December 2021 in the Hedwige and Prosperpolder [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's - Raw data of overflow tests executed in November and December 2021 in the Hedwige and Prosperpolder","DasType":"Data"},{"DasID":8938,"Acronym":null,"Citation":"Depreiter, D.; Verelst, K.; Vercruysse, J.; Peeters, P. (2025). Interreg Polder2C's: Discharge and equilibrium velocity values of hydraulic measurements for derivation of Manning roughness of the grass cover layer [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's: Discharge and equilibrium velocity values of hydraulic measurements for derivation of Manning roughness of the grass cover layer","DasType":"Software/models/scripts"},{"DasID":8954,"Acronym":null,"Citation":"Depreiter, D.; Verelst. K.; Vercruysse, J.; Peeters, P. (2025). Interreg Polder2C's: Discharge and equilibrium velocity values of hydraulic measurements for derivation of Manning roughness of the grass cover layer [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's: Discharge and equilibrium velocity values of hydraulic measurements for derivation of Manning roughness of the grass cover layer","DasType":null},{"DasID":8952,"Acronym":null,"Citation":"Depreiter, D.; Verelst. K.; Vercruysse, J.; Peeters, P. (2025). Interreg Polder2C's: Erosion resistance grass cover - limiting velocity as function of duration [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's: Erosion resistance grass cover - limiting velocity as function of duration","DasType":"Data"},{"DasID":8953,"Acronym":null,"Citation":"Depreiter, D.; Verelst. K.; Vercruysse, J.; Peeters, P. (2025). Interreg Polder2C's: General information and results of overflow tests on a grass covered levee [DATA SET]. Flanders Hydraulics","Title":"Interreg Polder2C's: General information and results of overflow tests on a grass covered levee","DasType":null}],"references":{"A1":[{"BRefID":409939,"RR":"<b>Depreiter, D.; Vercruysse, J.B.; Verelst, K.; Peeters, P.</b> (2025). Erosion Resistance Assessment of Grass-Covered Embankments: Insights from In Situ Overflow Tests at the Living Lab Hedwige-Prosper Polder. <i>Water 17(13)</i>: 2016. <a href=\"https://dx.doi.org/10.3390/w17132016\" target=\"_blank\">https://dx.doi.org/10.3390/w17132016</a>","AutID":73587,"MonDate":null,"AnaDate":2025,"PeerRev":1,"outputType":"1_A1","OpenAcc":0}],"Book":[{"BRefID":393296,"RR":"<b>Verelst, K.; Depreiter, D.; Vercruysse, J.B.; Peeters, P.</b> (2023). Insights from Steady Overflow Tests on Grass Covers within the Framework of Polder2C’s, <b><i>in</i></b>: <i>29th Meeting of European Working Group on Internal Erosion in Embankment Dams, Dikes and Levees and their Foundations, Lyon - July 2-5, 2023<br> - 4th Meeting of European Working Group on Overflow and Overtopping Erosion, Lyon - July 5-7, 2023.</i> pp. [1-2]","AutID":73587,"MonDate":null,"AnaDate":2023,"PeerRev":0,"outputType":"3_Book","OpenAcc":0},{"BRefID":317349,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Visser, K.P.</b> (2019). Physical model research on energy dissipation downstream of the new weirs of Denderleeuw in Belgium [PRESENTATION]. Presented at the 38th IAHR World Congress September 1-6, 2019, Panama City. Flanders Hydraulics Research: Antwerp.  17 slides pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":0},{"BRefID":300361,"RR":"<b>Verelst, K.; Vercruysse, J.B.; De Mulder, T.</b> (2018). Comparison of software for computation of longitudinal forces on a ship in a lock chamber during levelling with openings in the lock gate [PRESENTATION]. Presented at the 7th ISHS 2018, Aachen, 17/05/2018. Flanders Hydraulics Research/Ghent University: Antwerp.  24 slides pp.","AutID":73587,"MonDate":2018,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":0},{"BRefID":261302,"RR":"<b>Vercruysse, J.B.; Verelst, K.; De Mulder, T.</b> (2016). Stilling basin design for inlet sluice with vertical drop structure: scale model results vs. literature formulae [PRESENTATION]. Presented on the 4th IAHR Europe Congress, Liège, Belgium, 27-29 July 2016. Flanders Hydraulics Research/Ghent University: Antwerp.  26 slides pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":0},{"BRefID":282656,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Ramos, P.X.; De Mulder, T.</b> (2016). Experimental investigation of the influence of breaking logs on the flow patterns induced by lock filling with gate openings [PRESENTATION]. Presented on the 4th IAHR Europe Congress, Liège, Belgium, 27-29 July 2016. Flanders Hydraulics Research/Ghent University: Antwerp.  27 slides pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":0},{"BRefID":251637,"RR":"<b>Verelst, K.; Vercruysse, J.B.; De Mulder, T.; Fahner, T.; De Cock, W.; Pauwels, H.</b> (2015). Hydraulic design of a filling emptying system for the new Royers lock in the port of Antwerp (Belgium) [PRESENTATION]. Presented on the 36th IAHR WORLD CONGRESS, The Hague, 03 July 2015. Flanders Hydraulics Research: Antwerp.  19 slides pp.","AutID":73587,"MonDate":2015,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":0}],"BookChap":[{"BRefID":436140,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Nerincx, N.; Brachet, B.; Croix, R.; Meersschaert, J.; Queste, O.</b> (2025). <span lang=\"EN-US\" dir=\"ltr\">Canal Seine Nord Europe - physical modelling of Catigny lock with longitudinal culverts and side ports</span>, <b><i>in</i></b>: <i>SMART RIVERS 2025: Celebrating the World’s Navigable Waterways, 8-12 September 2025: Conference Proceedings.</i> pp. [1-10]","AutID":73587,"MonDate":null,"AnaDate":2025,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":393291,"RR":"<b>Van Bockstal, P.; de Beukelaer-Dossche, M.; Nollet, S.; Peeters, P.; Vercruysse, J.B.; Nerincx, N.</b> (2024). <p style=\"margin-left:0px;\">Digues résistantes à la surverse dans les zones d'inondation contrôlées dans le bassin versant de l'Escaut maritime en Flandre (Belgique), et perspectives pour la France, <b><i>in</i></b>: <i>Colloque Digues 2024 - Systèmes et ouvrages de protection contre les inondations d'origines maritimes et fluviales. État des lieux, avancées, innovations et perspectives, Aix-en-Provence.</i> pp. [1-10]. <a href=\"https://dx.doi.org/10.5281/zenodo.10600300\" target=\"_blank\">https://dx.doi.org/10.5281/zenodo.10600300</a>","AutID":73587,"MonDate":null,"AnaDate":2024,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":395780,"RR":"<b>Vercruysse, J.B.; Poitoux, S.; Ozden, E.; Goossens, M.; Aerssens, P.; Van Bastelaere, F.; Verelst, K.; Depreiter, D.; Wolput, Ben, B.; Schrijvers, A.</b> (2024). <span lang=\"EN-US\" dir=\"ltr\">Development of a new measurement tool for validating lock levelling</span>, <b><i>in</i></b>: Schonees, J.S. (Ed.) <i>Proceedings of the 35TH PIANC WORLD CONGRESS 2024, Cape Town, South Africa, 29 April – 03 May 2024.</i> pp. 1485-1491","AutID":73587,"MonDate":null,"AnaDate":2024,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":317342,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Visser, K.P.</b> (2019). Physical model research on energy dissipation downstream of the new weirs of Denderleeuw in Belgium, <b><i>in</i></b>: <i>38th IAHR World Congress September 1-6, 2019, Panama City, Panama: E-proceedings.</i> pp. 2510-2520","AutID":73587,"MonDate":null,"AnaDate":2019,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":300398,"RR":"<b>Vercruysse, J.B.; Verelst, K.; De Mulder, T.; Timmermans, R.</b> (2018). Physical model research on breaking logs for through the gate filling of new Sint-Baafs-Vijve lock, <b><i>in</i></b>: <i>34th PIANC World Congress 2018 in Panama City, Panama: abstracts.</i> pp. [1-2]","AutID":73587,"MonDate":null,"AnaDate":2018,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":304470,"RR":"<b>Vercruysse, J.B.; Verelst, K.; De Mulder, T.; Timmermans, R.</b> (2018). Physical model research on breaking logs for through the gate filling of new Sint-Baafs-Vijve lock, <b><i>in</i></b>: <i>34th PIANC World Congress 2018 in Panama City, Panama: papers.</i> pp. [1-16]","AutID":73587,"MonDate":null,"AnaDate":2018,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":300387,"RR":"<b>Verelst, K.; Vercruysse, J.B.; De Mulder, T.</b> (2018). Comparison of software for computation of longitudinal forces on a ship in a lock chamber during levelling with openings in the lock gate, <b><i>in</i></b>: Bung, D.B. <i>et al.</i> <i>7th IAHR International Symposium on Hydraulic Structures, Aachen, Germany, 15-18 May.</i> pp. [1-13]. <a href=\"https://dx.doi.org/10.15142/T3KD2H\" target=\"_blank\">https://dx.doi.org/10.15142/T3KD2H</a>","AutID":73587,"MonDate":null,"AnaDate":2018,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":261185,"RR":"<b>Vercruysse, J.B.; Verelst, K.; De Mulder, T.</b> (2016). Stilling basin design for inlet sluice with vertical drop structure: Scale model results vs. literature formulae, <b><i>in</i></b>: Erpicum, S. <i>et al.</i> <i>Proceedings of the 4th IAHR Europe Congress, Liege, Belgium, 27-29 July 2016: Sustainable Hydraulics in the Era of Global Change.</i> pp. 579-587","AutID":73587,"MonDate":null,"AnaDate":2016,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":261186,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Ramos, P.X.; De Mulder, T.</b> (2016). Experimental investigation of the influence of breaking logs on the flow patterns induced by lock filling with gate openings, <b><i>in</i></b>: Erpicum, S. <i>et al.</i> <i>Proceedings of the 4th IAHR Europe Congress, Liege, Belgium, 27-29 July 2016: Sustainable Hydraulics in the Era of Global Change.</i> pp. 618-628","AutID":73587,"MonDate":null,"AnaDate":2016,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":251498,"RR":"<b>Verelst, K.; Vercruysse, J.; De Mulder, T.; Fahner, T.</b> (2015). Hydraulic design of a filling emptying system for the new Royers lock in the port of Antwerp (Belgium), <b><i>in</i></b>: <i>E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands.</i> pp. 4563-4574","AutID":381019,"MonDate":null,"AnaDate":2015,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":223200,"RR":"<b>De Mulder, T.; Vercruysse, J.B.; Peeters, P.; Maris, T.; Meire, P.</b> (2013). Inlet sluices for flood control areas with controlled reduced tide in the Scheldt estuary: an overview, <b><i>in</i></b>: Bung, D.B. <i>et al.</i> (Ed.) <i>Proceedings of the international workshop on hydraulic design of low-head structures, Aachen, Germany, February, 20-22, 2013.</i> pp. 43-53","AutID":73587,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":223199,"RR":"<b>Vercruysse, J.B.; De Mulder, T.; Verelst, K.; Peeters, P.</b> (2013). Stilling basin optimization for a combined inlet-outlet sluice in the framework of the Sigmaplan, <b><i>in</i></b>: Bung, D.B. <i>et al.</i> (Ed.) <i>Proceedings of the international workshop on hydraulic design of low-head structures, Aachen, Germany, February, 20-22, 2013.</i> pp. 55-66","AutID":73587,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227338,"RR":"<b>Verelst, K.; Vercruysse, J.B.; De Mulder, T.</b> (2013). On a pragmatic force criterion for the design of a navigation lock filling and emptying system, <b><i>in</i></b>: Vantorre, M. <i>et al.</i> (Ed.) <i>Third international conference on ship manoeuvring in shallow and confined water: with non-exclusive focus on ship behaviour in locks, 3-5 June 2013, Ghent, Belgium.</i> pp. 325-335","AutID":73587,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":195961,"RR":"<b>De Mulder, T.; Verelst, K.; Vercruysse, J.B.; De Cock, W.; Haegeman, M.</b> (2010). On hawser force criteria for navigation lock design: Case study of maritime locks in port of Antwerp, <b><i>in</i></b>: <i>32nd PIANC Congress, 125th anniversary PIANC - setting the course, Liverpool, UK, Liverpool Arena and Convention Centre, 10 - 14 May 2010: PIANC MMX papers.</i> pp. [1-19]","AutID":73587,"MonDate":null,"AnaDate":2010,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1}],"Thesis":[{"BRefID":288950,"RR":"<b>Van Hoecke, L.</b> (2017). Onderzoek naar de waterspiegeldaling boven een vulstraal bij een nivelleersysteem met openingen in de deur. MSc Thesis. [S.n.]: Gent.  84 pp.","AutID":73587,"MonDate":2017,"AnaDate":null,"PeerRev":0,"outputType":"5_Thesis","OpenAcc":0},{"BRefID":247551,"RR":"<b>Everaert, M.; Van hulle, A.</b> (2015). Hydraulic study of a labyrinth weir integrated in a culvert: application to a spillway in a levee of the common Meuse. MSc Thesis. Ghent University. Faculty of Engineering and Architecture: Gent.  159 pp.","AutID":73587,"MonDate":2015,"AnaDate":null,"PeerRev":0,"outputType":"5_Thesis","OpenAcc":0},{"BRefID":239697,"RR":"<b>Rammant, N.</b> (2014). Physical model study of the falling nappe in combined inlet-outlet sluices for flood control areas with reduced tide. MSc Thesis. Ghent University, Department of Civil Engineering: Ghent.  xvi, 92 + 16 p. annexes pp.","AutID":73587,"MonDate":2014,"AnaDate":null,"PeerRev":0,"outputType":"5_Thesis","OpenAcc":0},{"BRefID":196188,"RR":"<b>Jacobs, R.; Van Obbergen, J.</b> (2010). Studie van overvulling en waterslag bij sluisvulling via omloopriolen. MSc Thesis. Campus De Nayer: Sint-Katelijne-Waver.  91 pp.","AutID":73587,"MonDate":2010,"AnaDate":null,"PeerRev":0,"outputType":"5_Thesis","OpenAcc":0}],"Abstr":[{"BRefID":196065,"RR":"<b>De Mulder, T.; Verelst, K.; Vercruysse, J.B.; De Cock, W.</b> (2010). Hydraulic design of a sediment discharge system for a new maritime lock, <b><i>in</i></b>: <i>32nd PIANC Congress, 125th anniversary PIANC - setting the course, Liverpool, UK, Liverpool Arena and Convention Centre, 10 - 14 May 2010: PIANC MMX book of abstracts.</i> pp. [1]","AutID":73587,"MonDate":null,"AnaDate":2010,"PeerRev":0,"outputType":"6_Abstr","OpenAcc":0},{"BRefID":195958,"RR":"<b>De Mulder, T.; Verelst, K.; Vercruysse, J.B.; De Cock, W.; Haegeman, M.</b> (2010). On hawser force criteria for navigation lock design: Case study of maritime locks in port of Antwerp, <b><i>in</i></b>: <i>32nd PIANC Congress, 125th anniversary PIANC - setting the course, Liverpool, UK, Liverpool Arena and Convention Centre, 10 - 14 May 2010: PIANC MMX book of abstracts.</i> pp. 290a - 290b","AutID":73587,"MonDate":null,"AnaDate":2010,"PeerRev":0,"outputType":"6_Abstr","OpenAcc":1}],"Report":[{"BRefID":437429,"RR":"<b>Malschaert, J.; Depreiter, D.; Vercruysse, J.B.; Meire, D.</b> (2026). Validatie LSPIV techniek voor in situ opmetingen: Metingen vispassage Kerkhove. Versie 4.0. <i>WL Rapporten</i>, 21_079_2. Waterbouwkundig Laboratorium: Antwerpen.  <a href=\"https://dx.doi.org/10.48607/375\" target=\"_blank\">https://dx.doi.org/10.48607/375</a>","AutID":73587,"MonDate":2026,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":436451,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Eloot, K.</b> (2025). Haven Antwerpen - Van Cauwelaertsluis: hydraulische en nautische impact nieuwe brugkelder. Versie 4.0. <i>WL Rapporten</i>, 24_025_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 22 pp. <a href=\"https://dx.doi.org/10.48607/364\" target=\"_blank\">https://dx.doi.org/10.48607/364</a>","AutID":73587,"MonDate":2025,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":407780,"RR":"<b>Verelst, K.; Vercruysse, J.B.; De Mulder, T.</b> (2025). Verdere ontwikkeling VUL_SLUIS: validatie VUL_SLUIS en LOCKFILL voor enkele praktijkcases. Versie 4.0. <i>WL Rapporten</i>, 15_007_4. Waterbouwkundig Laboratorium: Antwerpen. VII, 135 + 53 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/317\" target=\"_blank\">https://dx.doi.org/10.48607/317</a>","AutID":73587,"MonDate":2025,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":436719,"RR":"<b>Visser, K.P.; Vercruysse, J.B.</b> (2025). Vispassage op de Dender te Aalst: hydraulisch ontwerp. Versie 4.0. <i>WL Rapporten</i>, 24_037_1. Waterbouwkundig Laboratorium: Antwerp. VII, 32 + 5 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/374\" target=\"_blank\">https://dx.doi.org/10.48607/374</a>","AutID":73587,"MonDate":2025,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":404636,"RR":"<b>Vercruysse, J.B.; Verelst, K.; López Castaño, S.; Wolput, Ben, B.; Depreiter, D.; Schrijvers, S.</b> (2024). Ontwikkeling meetopstelling voor het opmeten van scheepsbewegingen. Versie 4.0. <i>WL Rapporten</i>, 19_084_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 47 + 4 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/271\" target=\"_blank\">https://dx.doi.org/10.48607/271</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":404899,"RR":"<b>Vercruysse, J.B.; Engels, M.; Janssens, K.; Nossent, J.; Verelst, K.</b> (2024). HDPE terugslagkleppen: Rapportering onderzoek in kader van opmaak bestektekst. Versie 4.0. <i>WL Rapporten</i>, 19_067_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 32 + 19 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/276\" target=\"_blank\">https://dx.doi.org/10.48607/276</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":404995,"RR":"<b>Vercruysse, J.B.; Visser, K.P.; Goormans, T.; Depreiter, D.; Claeys, S.; Vereecken, H.; Buysse, D.</b> (2024). Vispassage Kerkhove: validatiemeting en optimalisatie ontwerpmethodiek bekkenvormige vispassage. Versie 4.0. <i>WL Rapporten</i>, 22_030_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 79 + 21 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/281\" target=\"_blank\">https://dx.doi.org/10.48607/281</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":381229,"RR":"<b>Vercruysse, J.B.; Coen, L.; Verelst, K.</b> (2024). Sigmaplan – Gecontroleerd overstromingsgebied Vlassenbroek: ontwerp dissipatiegracht overloopdijk. Versie 4.0. <i>WL Rapporten</i>, 23_025_1. Waterbouwkundig Laboratorium: Antwerpen. VI, 22 pp. <a href=\"https://dx.doi.org/10.48607/228\" target=\"_blank\">https://dx.doi.org/10.48607/228</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":391620,"RR":"<b>Vercruysse, J.B.; Verelst, K.</b> (2024). Zeebrugge - Vandammesluis: optimalisatie openingswet Vlinderkleppen. Versie 4.0. <i>WL Rapporten</i>, 23_098_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 20 + 1 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/243\" target=\"_blank\">https://dx.doi.org/10.48607/243</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":404644,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Schrijvers, S.</b> (2024). Development of a new measurement tool for validating lock levellings. Version 4.0. <i>FH reports</i>, 19_084_2. Flanders Hydraulics: Antwerp. VI, 34 + pp. <a href=\"https://dx.doi.org/10.48607/272\" target=\"_blank\">https://dx.doi.org/10.48607/272</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":393775,"RR":"<b>Verelst, K.; Vercruysse, J.B.</b> (2024). Scaldissluis: Openingswet vlinderkleppen. Versie 3.0. <i>WL Rapporten</i>, 19_077_1. Waterbouwkundig Laboratorium: Antwerpen. VI, 17 + 3 p.bijl. pp. <a href=\"https://dx.doi.org/10.48607/254\" target=\"_blank\">https://dx.doi.org/10.48607/254</a>","AutID":73587,"MonDate":2024,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":405517,"RR":"<b>Depreiter, D.; Vercruysse, J.B.; Verelst, K.; Peeters, P.</b> (2023). Insights from Steady overflow and Wave overtopping tests. Version 4.0. <i>FH reports</i>, 20_047_4. Flanders Hydraulics: Antwerp. 65 pp. <a href=\"https://dx.doi.org/10.48607/285\" target=\"_blank\">https://dx.doi.org/10.48607/285</a>","AutID":73587,"MonDate":2023,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":405505,"RR":"<b>Vercruysse, J.B.; Depreiter, D.; López Castaño, S.; Verelst, K.; Peeters, P.</b> (2023). Design and application of an overflow generator. version 4.0. <i>FH reports</i>, 20_047_1. Flanders Hydraulics: Antwerp. 46 pp. <a href=\"https://dx.doi.org/10.48607/284\" target=\"_blank\">https://dx.doi.org/10.48607/284</a>","AutID":73587,"MonDate":2023,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":360628,"RR":"<b>Verelst, K.; Vercruysse, J.</b> (2023). Denderbelle – Vernieuwing stuwsluis: deelrapport 3. Simulaties ontwerp nivelleersysteem sluis. Versie 7.0. <i>WL Rapporten</i>, 15_062_3. Waterbouwkundig Laboratorium: Antwerpen. X, 80 + 42 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/147\" target=\"_blank\">https://dx.doi.org/10.48607/147</a>","AutID":73587,"MonDate":2023,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":393111,"RR":"<b>Depreiter, D.; Vercruysse, J.B.; Verelst, K.; Zomer, W.; Koelewijn, A.; Tsimopoulou, V.; Peeters, P.</b> (2022). Overflow tests on Belgian levees. Version 1.0. Interreg 2 Seas Mers Zeeën Polder2C's: [s.l.]. 103 pp. <a href=\"https://dx.doi.org/10.48607/361\" target=\"_blank\">https://dx.doi.org/10.48607/361</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":393112,"RR":"<b>Depreiter, D.; Vercruysse, J.B.; Verelst, K.; Zomer, W.; Koelewijn, A.; Tsimopoulou, V.; Peeters, P.</b> (2022). Overflow tests on Belgian levees: annexes. Version 0.2. Interreg 2 Seas Mers Zeeën Polder2C's: [s.l.]. 154 pp.","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":393115,"RR":"<b>Depreiter, D.; Vercruysse, J.B.; Verelst, K.; Zomer, W.; Koelewijn, A.; Tsimopoulou, V.; Peeters, P.</b> (2022). Overflow tests on Dutch levees. Version 1.0. Interreg 2 Seas Mers Zeeën Polder2C's: [s.l.]. 110 pp. <a href=\"https://dx.doi.org/10.48607/362\" target=\"_blank\">https://dx.doi.org/10.48607/362</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":393117,"RR":"<b>Depreiter, D.; Vercruysse, J.B.; Verelst, K.; Zomer, W.; Koelewijn, A.; Tsimopoulou, V.; Peeters, P.</b> (2022). Overflow tests on Dutch levees: annexes. Version 1.0. Interreg 2 Seas Mers Zeeën Polder2C's: [s.l.]. 105 pp.","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":351984,"RR":"<b>López Castaño, S.; Vercruysse, J.</b> (2022). Hydraulics of Neerharen Lock’s side drainage: pre‐design of inlet and outlet constructions. Version 4.0. <i>FHR reports</i>, 21_083_1. Flanders Hydraulics Research: Antwerp. VIII, 30 pp. <a href=\"https://dx.doi.org/10.48607/97\" target=\"_blank\">https://dx.doi.org/10.48607/97</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":349548,"RR":"<b>López Castaño, S.; Vercruysse, J.; Visser, K.P.</b> (2022). Trash racks and fish diversion screens: literature Study and workedout examples. Version 3.0. <i>FHR reports</i>, 21_016_1. Flanders Hydraulics Research: Antwerp. VII, 36 + app. pp. <a href=\"https://dx.doi.org/10.48607/70\" target=\"_blank\">https://dx.doi.org/10.48607/70</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":349850,"RR":"<b>Vercruysse, J.; De Backer, G.; Verelst, K.</b> (2022). Geotextiel voor waterbouwkundige toepassingen: studie naar vereisten voor gronddichtheid en waterdoorlaatbaarheid. Versie 3.0. <i>WL Rapporten</i>, 17_102_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 23 + 2 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/81\" target=\"_blank\">https://dx.doi.org/10.48607/81</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":351620,"RR":"<b>Vercruysse, J.; Verelst, K.</b> (2022). Sigmaplan – Gereduceerde Getijdegebieden – Wal Zwijn: ontwerp dissipatiegracht. Versie 4.0. <i>WL Rapporten</i>, 21_010_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 17 pp. <a href=\"https://dx.doi.org/10.48607/95\" target=\"_blank\">https://dx.doi.org/10.48607/95</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":353396,"RR":"<b>Vercruysse, J.; Verelst, K.; Timmermans, R.</b> (2022). Renovatie sluis Ooigem op het kanaal Roeselare Leie: opstellen openingswet hefschuiven. Versie 3.0. <i>WL Rapporten</i>, 20_096_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 36 + 12 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/114\" target=\"_blank\">https://dx.doi.org/10.48607/114</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":353229,"RR":"<b>Vercruysse, J.B.; López Castaño, S.; Verelst, K.; Verwilligen, J.</b> (2022). Complex project Nieuwe Sluis Zeebrugge: voorontwerp nivelleersysteem. Versie 3.0. <i>WL Rapporten</i>, 20_054_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 54 + 13 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/105\" target=\"_blank\">https://dx.doi.org/10.48607/105</a>","AutID":73587,"MonDate":2022,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":334844,"RR":"<b>López Castaño, S.; Verelst, K.; Verwilligen, J.; Van Hoydonck, W.; Vercruysse, J.; Mostaert, F.</b> (2021). Side drainage operation in Dessel‐Schoten canal's lock no. 3: hydraulics and navigability assessment. Version 3.0. <i>FHR reports</i>, 18_134_1. Flanders Hydraulics Research: Antwerp. VII, 33 + 5 p. app. pp. <a href=\"https://dx.doi.org/10.48607/10\" target=\"_blank\">https://dx.doi.org/10.48607/10</a>","AutID":73587,"MonDate":2021,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":347123,"RR":"<b>Vercruysse, J.; Visser, K.P.; Verelst, K.</b> (2021). Sigmaplan – Gereduceerde Getijdegebieden–Wal Zwijn: revisie gecombineerde in- en uitwateringsconstructies. Versie 3.0. <i>WL Rapporten</i>, 20_041_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 25 pp. <a href=\"https://dx.doi.org/10.48607/46\" target=\"_blank\">https://dx.doi.org/10.48607/46</a>","AutID":73587,"MonDate":2021,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":340331,"RR":"<b>Vermeersch, S.; Baeyens, R.; Coeck, J.; De Maerteleire, N.; Gelaude, E.; Robberechts, K.; Pieters, S.; Smolders, S.; Vercruysse, J.; Visser, K.P.</b> (2021). Evaluatie van de in- en uitwateringssluizen van overstromingsgebieden voor vismigratie: een case studie voor Bazel en Bergenmeersen. <i>Rapporten van het Instituut voor Natuur- en Bosonderzoek</i>, 2021(30). Instituut voor Natuur- en Bosonderzoek (INBO): Brussel. 98 pp. <a href=\"https://dx.doi.org/10.21436/inbor.39514496\" target=\"_blank\">https://dx.doi.org/10.21436/inbor.39514496</a>","AutID":381019,"MonDate":2021,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":1},{"BRefID":322111,"RR":"<b>Smolders, S.; De Maerschalck, B.; Vercruysse, J.B.; Plancke, Y.; Mostaert, F.</b> (2020). Uitwatering Galgenweel: uitstroom via de oude en nieuwe constructie. Versie 2.0. <i>WL Rapporten</i>, 19_111_1. Waterbouwkundig Laboratorium: Antwerpen. 36 + 4 p. bijl. pp.","AutID":73587,"MonDate":2020,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":323485,"RR":"<b>Vercruysse, J.; Verelst, K.; Mostaert, F.</b> (2020). Sigmaplan – Gereduceerde Getijdegebieden – Schaalmodelproeven gecombineerde in- en uitwateringsconstructies: deelrapport 7. Inzichten uit schaalmodelproeven. Versie 4.0. <i>WL Rapporten</i>, 00_075_7. Waterbouwkundig Laboratorium: Antwerpen. VIII, 90 + 4 p. bijl. pp.","AutID":73587,"MonDate":2020,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":324254,"RR":"<b>Vercruysse, J.; Verelst, K.; Mostaert, F.</b> (2020). Complex project nieuwe sluis Zeebrugge: bepaling benodigde doorstroomsectie nivelleersysteem. Versie 4.0. <i>WL Rapporten</i>, 19_069_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 20 + 2 p. bijl. pp.","AutID":73587,"MonDate":2020,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":330267,"RR":"<b>Verelst, K.; Coen, L.; López Castaño, S.; Vercruysse, J.B.; Van Hoydonck, W.; Mostaert, F.</b> (2020). Zenneduiker te Halle: hydraulisch ontwerp loodrechte kruising kanaal Brussel-Charleroi. Versie 6.0. <i>WL Rapporten</i>, 18_093_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 60 + 111 p. bijl. pp. <a href=\"https://dx.doi.org/10.48607/354\" target=\"_blank\">https://dx.doi.org/10.48607/354</a>","AutID":73587,"MonDate":2020,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":334192,"RR":"<b>Visser, K.P.; Verelst, K.; Vercruysse, J.; Buysse, D.; Vanderkimpen, P.; Viaene, P.; Mostaert, F.</b> (2020). Vispassage op de Leie te Sint-Baafs-Vijve: hydraulisch ontwerp. Versie 6.0. <i>WL Rapporten</i>, 15_036_2. Waterbouwkundig Laboratorium: Antwerpen. VIII, 83 + 10 p. bijl. pp.","AutID":73587,"MonDate":2020,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":309980,"RR":"<b>Coen, L.; Vercruysse, J.B.; Mostaert, F.</b> (2019). GOG-GGG Bovenzanden: dimsensionering in- en uitwateringssluizen. versie 4.0. <i>WL Rapporten</i>, 18_011_1. Waterbouwkundig Laboratorium: Antwerpen. VI, 21 pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":305288,"RR":"<b>Smolders, S.; Vercruysse, J.B.; Spiesschaert, T.; Geerts, S.; Mostaert, F.</b> (2019). Modelling culverts in TELEMAC: code validation with scale flume model of Doelpolder. Version 3.0. <i>FHR reports</i>, 18_145_1. Flanders Hydraulics Research: Antwerp. VII, 30 pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":321065,"RR":"<b>Vercruysse, J.; Verelst, K.; De Mulder, T.; Mostaert, F.</b> (2019). Hydraulisch onderzoek naar breekbalken voor sluizen met nivelleeropeningen in de deuren: eindrapport. Versie 3.0. <i>WL Rapporten</i>, 14_050_4. Waterbouwkundig Laboratorium: Antwerpen. VIII, 76 + 16 p. bijl. pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":316701,"RR":"<b>Vercruysse, J.B.; Vanderkimpen, P.; Claeys, S.; Mostaert, F.</b> (2019). Complex project nieuwe sluis Zeebrugge: opmeten densiteitsverschil tussen voorhaven en achterhaven. Versie 4.0. <i>WL Rapporten</i>, 18_041_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 42 + 13 p. bijl. pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":319274,"RR":"<b>Vercruysse, J.B.; Verelst, K.; De Mulder, T.; Mostaert, F.</b> (2019). Verdere ontwikkeling programma VUL_SLUIS: systematische vergelijking VUL_SLUIS en LOCKFILL. Versie 6.0. <i>WL Rapporten</i>, 15_007_2. Waterbouwkundig Laboratorium: Antwerpen. VII, 26 + 50 p. bijl. pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":317269,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2019). Haven Antwerpen - Kieldrechtsluis: validatie hydraulisch netwerkmodel met betrekking tot overvullen en overledigen. Versie 4.0. <i>WL Rapporten</i>, 19_039_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 17 + 9 p.bijl. pp. <a href=\"https://dx.doi.org/10.48607/106\" target=\"_blank\">https://dx.doi.org/10.48607/106</a>","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":306432,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2019). Haven Antwerpen – Renovatie Royerssluis: haalbaarheidsstudie nivelleersysteem met woelkelder in het bovenhoofd. Versie 3.0. <i>WL Rapporten</i>, 18_056_1. Waterbouwkundig Laboratorium: Antwerpen. VI, 29 + 7 p. bijl. pp.","AutID":73587,"MonDate":2019,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":304386,"RR":"<b>Smolders, S.; Vercruysse, J.B.; Visser, K.P.; Henderick, A.; Coen, L.; Mostaert, F.</b> (2018). Sigmaplan – Vismigratie gereduceerde getijdegebieden: bepalen debiet in‐ en uitwatering GOG‐GGG Bergenmeersen en Bazel. Versie 3.0. <i>WL Rapporten</i>, 16_094_1. Waterbouwkundig Laboratorium: Antwerpen. IX, 69 + 2 p. bijl. pp.","AutID":73587,"MonDate":2018,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":230420,"RR":"<b>Vercruysse, J.B.; De Mulder, T.; Verelst, K.; Schindfessel, L.; Peeters, P.; Mostaert, F.</b> (2018). Zeekanaal Brussel Schelde - sluis Zemst: rapportage schaalmodelonderzoek vulling via openingen in het middenhoofd. Versie 3.0. <i>WL Rapporten</i>, 12_044_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 74 + 12 p. bijlagen pp.","AutID":73587,"MonDate":2018,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":294260,"RR":"<b>Vercruysse, J.B.; Van Hoydonck, W.; Verelst, K.; Mostaert, F.</b> (2018). Dender – Nieuwe sluis Aalst: CFD‐modellering van een geleiding opwaarts van de nivelleeropeningen. Versie 4.0. <i>WL Rapporten</i>, 17_064_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 21 + 54 p. bijlagen pp.","AutID":73587,"MonDate":2018,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":296944,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2018). Denderbelle – Vernieuwing stuwsluis Denderbelle: deelrapport 6. Schaalmodelstudie breekbalken. versie 4.0 . <i>WL Rapporten</i>, 15_062_6. Waterbouwkundig Laboratorium: Antwerpen. VII, 20 + 4 p. bijlagen pp.","AutID":73587,"MonDate":2018,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":300196,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2018). Dender ‐ Nieuwe sluis Aalst: opstellen openingswet nivelleersysteem. Versie 4.0. <i>WL Rapporten</i>, 18_002_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 27 + 7 p. bijl. pp.","AutID":73587,"MonDate":2018,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":291100,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Van Hoydonck, W.; Mostaert, F.</b> (2017). Strategisch haveninfrastructuur project Zeebrugge: hydraulisch ontwerp nivelleersysteem sluis met korte omloopriolen. Versie 3.0. <i>WL Rapporten</i>, 15_035_1. Waterbouwkundig Laboratorium: Antwerpen. IX, 63 + 23 p. bijlagen pp.","AutID":73587,"MonDate":2017,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":289046,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Peeters, P.; Mostaert, F.</b> (2017). Haven van Antwerpen ‐ Royerssluis: aanvullende simulaties nivelleersysteem met omloopriolen in sluishoofden. Versie 4.0. <i>WL Rapporten</i>, 17_041_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 25 + 31 p. bijlagen pp.","AutID":73587,"MonDate":2017,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":285787,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Peeters, P.; Mostaert, F.</b> (2017). Haven Antwerpen ‐ Kieldrechtsluis: meting overvulling en overlediging. Versie 4.0. <i>WL Rapporten</i>, 16_106_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 22 + 58 p. bijl. pp.","AutID":73587,"MonDate":2017,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":290333,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2017). Klasse Vb sluis te Sint‐Baafs‐Vijve: optimalisatie ontwerp breekbalken. versie 4.0. <i>WL Rapporten</i>, 16_065_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 41 + 13 p. bijl. pp.","AutID":73587,"MonDate":2017,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":291485,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2017). Haven van Antwerpen: Kieldrechtsluis: simulaties reduceren overvulling en overlediging. Version 7.0. <i>WL Rapporten</i>, 17_059_1. Waterbouwkundig Laboratorium: Antwerpen. VII, 34 + 79 p. bijlagen pp.","AutID":73587,"MonDate":2017,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":282854,"RR":"<b>Vercruysse, J.B.; Visser, K.P.; Peeters, P.; Mostaert, F.</b> (2016). Gereduceerd getijdegebied Doelpolder: schaalmodelproeven gecombineerde in‐ en uitwateringsconstructie. Versie 4.0. <i>WL Rapporten</i>, 15_073_1. Waterbouwkundig Laboratorium: Antwerpen. IX, 37 + 19 p. bijlagen pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":1},{"BRefID":253379,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Peeters, P.; Mostaert, F.</b> (2016). Zeekanaal Brussel Schelde – sluis Zemst: verslag terreinmeting vulling afwaartse kolk. Versie 4.0. <i>WL Adviezen</i>, 15_061. Waterbouwkundig Laboratorium: Antwerpen. III, 23 + 15 p. bijlagen pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":281785,"RR":"<b>Vercruysse, J.B.; Verelst, K.; De Mulder, T.; Peeters, P.; Mostaert, F.</b> (2016). Haven van Antwerpen - Royerssluis: deelrapport 2. Hydraulisch ontwerp nivelleersysteem met omloopriolen in sluishoofden voor vernieuwde Royerssluis. Versie 3.0. <i>WL Rapporten</i>, 12_131_2. Waterbouwkundig Laboratorium: Antwerpen. XI, 104 + 35 p. bijl. pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":1},{"BRefID":281842,"RR":"<b>Vercruysse, J.B.; De Maerschalck, B.; Claeys, S.; Boey, I.; Peeters, P.; Mostaert, F.</b> (2016). Sedimentatie in deurnissen van puntdeuren: analyse geometrie, bathymetrie en bodemstalen. versie 4.0. <i>WL Adviezen</i>, 15_088_1. Waterbouwkundig Laboratorium: Antwerpen. IX, 51 + 16 p. bijlagen pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":281873,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Peeters, P.; Mostaert, F.</b> (2016). Twentekanaal - sluis Eefde: hydraulische simulaties conceptontwerp nivelleersysteem. Versie 5.0. <i>WL Rapporten</i>, 16_074_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 23 + 21 p. appendices pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":282463,"RR":"<b>Verelst, K.; Vercruysse, J.B.; Taverniers, E.; De Mulder, T.; Verwilligen, J.; Peeters, P.; Mostaert, F.</b> (2016). Ondersteuning ontwerp klasse Vb‐sluis te Sint‐Baafs‐Vijve: deelrapport 4. Dimensionering bodembescherming stuwsluis. Versie 11.0. <i>WL Rapporten</i>, 12_142_4. Waterbouwkundig Laboratorium: Antwerpen. XII, 63 + 51 p. bijlagen pp.","AutID":73587,"MonDate":2016,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":223380,"RR":"<b>Vercruysse, J.B.; Verelst, K.; Taverniers, E.; Peeters, P.; Mostaert, F.</b> (2013). Sigmaplan – Gereduceerde Getijdegebieden – schaalmodelproeven gecombineerde in- en uitwateringsconstructies: deelrapport 2. Dijlemonding. Versie 2.0. <i>WL Rapporten</i>, 00_075. Waterbouwkundig Laboratorium: Antwerpen. VII, 61 pp.","AutID":73587,"MonDate":2013,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":208562,"RR":"<b>Vercruysse, J.B.; De Mulder, T.; Mostaert, F.</b> (2011). Ringvaart om Gent - Tweede sluis Evergem: verslag van terreinmeting inzake vullen- en ledigen. versie 2.0. <i>WL Rapporten</i>, 760_13. Waterbouwkundig Laboratorium: Antwerpen. IV, 45 + 73 p. bijl. pp.","AutID":73587,"MonDate":2011,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":118963,"RR":"<b>De Mulder, T.; Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2007). Tweede sluis Waaslandhaven: opmaak numeriek modelinstrumentarium voor vul- en ledigingssysteem. <i>WL Rapporten</i>, 760_03A-2. Waterbouwkundig Laboratorium: Antwerpen. 18 + 51 p. bijlagen pp.","AutID":73587,"MonDate":2007,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":118963,"RR":"<b>De Mulder, T.; Vercruysse, J.B.; Verelst, K.; Mostaert, F.</b> (2007). Tweede sluis Waaslandhaven: opmaak numeriek modelinstrumentarium voor vul- en ledigingssysteem. <i>WL Rapporten</i>, 760_03A-2. Waterbouwkundig Laboratorium: Antwerpen. 18 + 51 p. bijlagen pp.","AutID":73587,"MonDate":2007,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":118490,"RR":"<b>De Mulder, T.; Vercruysse, J.B.</b> (2007). Tweede sluis Waaslandhaven: verslag van de meetcampagnes Berendrecht- en zandvlietsluis. versie 2.0. <i>WL Rapporten</i>, 760_03A. Waterbouwkundig Laboratorium: Antwerpen. IV, 21 + 49 p. bijlagen pp.","AutID":73587,"MonDate":2007,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0},{"BRefID":118490,"RR":"<b>De Mulder, T.; Vercruysse, J.B.</b> (2007). Tweede sluis Waaslandhaven: verslag van de meetcampagnes Berendrecht- en zandvlietsluis. versie 2.0. <i>WL Rapporten</i>, 760_03A. Waterbouwkundig Laboratorium: Antwerpen. IV, 21 + 49 p. bijlagen pp.","AutID":73587,"MonDate":2007,"AnaDate":null,"PeerRev":0,"outputType":"7_Report","OpenAcc":0}],"ThesisPromotor":[{"BRefID":288950,"RR":"<b>Van Hoecke, L.</b> (2017). Onderzoek naar de waterspiegeldaling boven een vulstraal bij een nivelleersysteem met openingen in de deur. MSc Thesis. [S.n.]: Gent.  84 pp.","MonDate":2017,"PeerRev":0,"Role":"Co-promotor"},{"BRefID":239697,"RR":"<b>Rammant, N.</b> (2014). Physical model study of the falling nappe in combined inlet-outlet sluices for flood control areas with reduced tide. MSc Thesis. Ghent University, Department of Civil Engineering: Ghent.  xvi, 92 + 16 p. annexes pp.","MonDate":2014,"PeerRev":0,"Role":"Promotor"},{"BRefID":196188,"RR":"<b>Jacobs, R.; Van Obbergen, J.</b> (2010). Studie van overvulling en waterslag bij sluisvulling via omloopriolen. MSc Thesis. Campus De Nayer: Sint-Katelijne-Waver.  91 pp.","MonDate":2010,"PeerRev":0,"Role":"Promotor"},{"BRefID":138408,"RR":"<b>Vanderheyden, E.; Vermerckt, M.</b> (2009). Hydraulische studie van de sluisvulling via openingen in de deuren. MSc Thesis. De Nayer Instituut: Sint-Katelijne-Waver.  xi, 86 + appendices + cd-rom pp.","MonDate":2009,"PeerRev":0,"Role":"Promotor"},{"BRefID":216857,"RR":"<b>Baeyens, A.</b> (2007). An implementation strategy of scientific instrumentation on a ROV for cold water coral reef research. MSc Thesis. RCMG: Gent.  21 pp.","MonDate":2007,"PeerRev":0,"Role":"Promotor"}]},"urls":[{"URL":"https://orcid.org/0009-0002-1134-4549","externalID":"0009-0002-1134-4549","URLTypeCode":"ORCID","URLType":"ORCID"}],"spcols":[{"SpColID":27,"SpName":"ScheldeMonitor","ShortName":"scheldemonitor"},{"SpColID":130,"SpName":"Waterbouwkundig Laboratorium","ShortName":"WL"}],"thesterms":[{"ThesaurusTerm":"Bridge piles","Code":null,"ThestID":170051,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Culverts","Code":null,"ThestID":170047,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Dikes, shores and other flood defenses","Code":null,"ThestID":170050,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Erosion protection","Code":null,"ThestID":170071,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Fishpasses","Code":null,"ThestID":170049,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Hydraulic structures","Code":null,"ThestID":169925,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Hydraulic structures","Code":"02010601","ThestID":179315,"ThesTypID":23,"ThesType":"Flemish Research Disciplines"},{"ThesaurusTerm":"Locks","Code":null,"ThestID":170045,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Pumps and turbines","Code":null,"ThestID":170052,"ThesTypID":12,"ThesType":"WL Kennisdomein"},{"ThesaurusTerm":"Weirs","Code":null,"ThestID":170048,"ThesTypID":12,"ThesType":"WL Kennisdomein"}],"taxterms":null,"pub":1,"newses":{"SesID":27140,"LoginName":"stevenc","LoginID":70,"DD":"2007-06-11"},"updses":{"SesID":116841,"LoginName":"Stevenc","LoginID":70,"DD":"2025-10-13"},"urlmaps":[],"resmessage":"no id specified","complete":1}
