    {"personrec":{"StatusID":1,"PersStatus":null,"Status":"Valid","PersID":19810,"PersName":"De Beukelaer-Dossche, Michaël","PublicFlag":1,"CheckedFlag":0,"Surname":"De Beukelaer-Dossche","Firstname":"Michaël","Initials":"M.","AddressedAs":null,"Function":null,"DateLastModified":{"date":"2023-05-02 10:08:18.393000","timezone_type":1,"timezone":"+00:00"},"PersTitle":null,"PersStatusID":null,"AbstractEnglish":null,"AbstractOtherLang":null,"AbstractLangCode":null,"AbstractLangID":null,"AutID":234962,"ND":"2009-06-25","UD":"2009-06-25"},"loaninfo":null,"pictures":[],"institutes":[{"instituterec":{"OrderNr":1,"Acronym":null,"ENFunction":"Head of Investments","InsIDtmp":1728,"OrigNameLangCode":null,"OrigNameLangID":null,"FullOrigName":null,"InsID":1728,"Function":"Head of Investments","BeginDay":null,"BeginMonth":null,"BeginYear":null,"Begindate":"","Enddate":"","PIAdrID":143093,"AdrID":112856,"Line1":null,"Line2":null,"Line3":null,"Line4":null,"Phone":"+32-(0)3-224 93 66","GSM":null,"Email":"michael.debeukelaer-dossche@wenz.be","EnvName":"Belgium","EncAddress":"Anna-Bijns-gebouw, Lange Kievitstraat 111-113, bus 44, 2018 Antwerpen, Belgium","FullStandardName":"Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Zeeschelde","DirectorFlag":null,"MarineSciFlag":null,"SpecializedFlag":null},"parent":null,"institutes":null,"references":null,"conferences":null,"datasets":null,"persons":null,"pastpers":null,"subpers":null,"projects":null,"urls":null,"pictures":null,"published":null,"affrefs":null,"collections":null,"thesterms":null,"taxterms":null,"geoterms":null,"thestermsFRIS":null,"nXtins":null,"previns":null,"spcols":null,"resmessage":"no id specified","complete":0,"participantrec":null,"peerrevs":null,"urlmaps":null}],"pastins":[],"projects":[],"datasets":null,"references":{"Book":[{"BRefID":227165,"RR":"<b>De Beukelaer-Dossche, M.; Decleyre, D. (Ed.)</b> (2013). Bergenmeersen: Bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan. Waterwegen en Zeekanaal/Agentschap voor Natuur en Bos: Antwerpen. ISBN 9789040303395. 99 pp.","AutID":162865,"MonDate":2013,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":1},{"BRefID":228865,"RR":"<b>De Beukelaer-Dossche, M.; Decleyre, D. (Ed.)</b> (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp.","AutID":164722,"MonDate":2013,"AnaDate":null,"PeerRev":0,"outputType":"3_Book","OpenAcc":1}],"BookChap":[{"BRefID":393291,"RR":"<b>Van Bockstal, P.; de Beukelaer-Dossche, M.; Nollet, S.; Peeters, P.; Vercruysse, J.B.; Nerincx, N.</b> (2024). <p style=\"margin-left:0px;\">Digues résistantes à la surverse dans les zones d'inondation contrôlées dans le bassin versant de l'Escaut maritime en Flandre (Belgique), et perspectives pour la France, <b><i>in</i></b>: <i>Colloque Digues 2024 - Systèmes et ouvrages de protection contre les inondations d'origines maritimes et fluviales. État des lieux, avancées, innovations et perspectives, Aix-en-Provence.</i> pp. [1-10]. <a href=\"https://dx.doi.org/10.5281/zenodo.10600300\" target=\"_blank\">https://dx.doi.org/10.5281/zenodo.10600300</a>","AutID":520163,"MonDate":null,"AnaDate":2024,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":362011,"RR":"<b>Adams, R.; van Holland, G.; Vansteenkiste, J.; van Rompaey, M.; de Beukelaer-Dossche, M.; Bosmans, S.</b> (2023). An integrated approach to define estuarine system resilience, applied to the Upper Sea Scheldt, Flanders, Belgium, <b><i>in</i></b>: Li, Y. <i>et al.</i> <i>Proceedings of PIANC Smart Rivers 2022: Green Waterways and Sustainable Navigations. Lecture Notes in Civil Engineering,</i> 264: pp. 1052-1068. <a href=\"https://dx.doi.org/10.1007/978-981-19-6138-0_93\" target=\"_blank\">https://dx.doi.org/10.1007/978-981-19-6138-0_93</a>","AutID":520163,"MonDate":null,"AnaDate":2023,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":249925,"RR":"<b>Eloot, K.; Vantorre, M.; Adams, R.; Bosmans, S.; De Beukelaer-Dossche, M.</b> (2015). Design guidelines versus practices for the Upper Sea Scheldt, the inland waterway connection between Antwerp and Ghent, <b><i>in</i></b>: <i>SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet.</i> pp. paper 99 (12 p.)","AutID":162865,"MonDate":null,"AnaDate":2015,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":249583,"RR":"<b>van Holland, G.; Depreiter, D.; Winterwerp, H.; De Beukelaer-Dossche, M.</b> (2015). Sediment management in the Seascheldt - risk of hyper turbidity, <b><i>in</i></b>: Toorman, E.A. <i>et al.</i> (Ed.) <i>INTERCOH2015: 13th International Conference on Cohesive Sediment Transport Processes. Leuven, Belgium, 7-11 September 2015. VLIZ Special Publication,</i> 74: pp. 120-121","AutID":200215,"MonDate":null,"AnaDate":2015,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":228882,"RR":"<b>De Beukelaer-Dossche, M.</b> (2013). General evaluation, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan.</i> pp. 129-133","AutID":164725,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227225,"RR":"<b>De Beukelaer-Dossche, M.</b> (2013). Algemene evaluatie, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan.</i> pp. 95-97","AutID":162865,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227209,"RR":"<b>De Beukelaer-Dossche, M.; Van den Bergh, E.</b> (2013). Context, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan.</i> pp. 9-21","AutID":162865,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":228870,"RR":"<b>De Beukelaer-Dossche, M.; Van den Bergh, E.</b> (2013). Context, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan.</i> pp. 11-29","AutID":164725,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":228879,"RR":"<b>De Beukelaer-Dossche, M.; Vanremoortele, S.</b> (2013). Work, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan.</i> pp. 111-119","AutID":164725,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227223,"RR":"<b>De Beukelaer-Dossche, M.; Vanremoortele, S.</b> (2013). Uitvoering van de werken, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan.</i> pp. 81-87","AutID":162865,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227207,"RR":"<b>Decleyre, D.; De Beukelaer-Dossche, M.</b> (2013). Inleiding, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan.</i> pp. 5-6","AutID":162865,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":228868,"RR":"<b>Decleyre, D.; De Beukelaer-Dossche, M.</b> (2013). Introduction, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan.</i> pp. 7-8","AutID":164725,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":228874,"RR":"<b>Meylemans, E.; Haelterman, K.; De Beukelaer-Dossche, M.; Peeters, P.</b> (2013). Preparatory investigation, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan.</i> pp. 87-99","AutID":164725,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227221,"RR":"<b>Meylemans, E.; Haelterman, K.; De Beukelaer-Dossche, M.; Peeters, P.</b> (2013). Voorbereidend onderzoek, <b><i>in</i></b>: De Beukelaer-Dossche, M. <i>et al.</i> (Ed.) <i>Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan.</i> pp. 63-71","AutID":162865,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":1},{"BRefID":227274,"RR":"<b>Peeters, P.; De Beukelaer-Dossche, M.; DeWolf, P.; Verwaest, T.</b> (2013). Introduction à la protection contre les submersions en Flandre [PRESENTATION], <b><i>in</i></b>: <i>Digues maritimes et fluviales de protection contre les submersions - 2ème colloque national 12-14 juin 2013, Aix en Provence.</i> pp. 31 slides","AutID":162832,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0},{"BRefID":286457,"RR":"<b>Peeters, P.; De Beukelaer-Dossche, M.; De Wolf, P.; Verwaest, T.</b> (2013). Introduction à la protection contre les submersions en Flandre, <b><i>in</i></b>: Royet, P. <i>et al.</i> (Ed.) <i>Digues maritimes et fluviales de protection contre les submersions - 2ème colloque national – Digues2013, 12-14 juin 2013, Aix en Provence.</i> pp. 3-10","AutID":164725,"MonDate":null,"AnaDate":2013,"PeerRev":0,"outputType":"4_BookChap","OpenAcc":0}],"Abstr":[{"BRefID":260389,"RR":"<b>Adams, R.; Depreiter, D.; Van Holland, G.; De Beuckelaer-Dossche, M.; Van Ryckegem, G.</b> (2016). Integrated plan of the upper sea Scheldt: towards a sustainable future, <b><i>in</i></b>: Meire, P. (Ed.) <i>Book of abstracts: ECSA Local Meeting 2016. Estuarine Restoration: from theory to practice and back, University of Antwerp, Antwerp, Belgium, 5-9 July 2016. VLIZ Special Publication,</i> 77: pp. 72","AutID":234962,"MonDate":null,"AnaDate":2016,"PeerRev":0,"outputType":"6_Abstr","OpenAcc":1},{"BRefID":248318,"RR":"<b>van Holland, G.; Depreiter, D.; Adams, R.; Vanlede, J.; Van Ryckegem, G.; van Engeland, T.; Roose, F.; De Beukelaer-Dossche, M.</b> (2015). Turn the tide: scientific research towards an integrated plan for the Upper-Seascheldt, <b><i>in</i></b>: <i>Scheldt Estuary: physics and integrated management - Special Session on of the 36th IAHR WORLD CONGRESS, 28 June – 3 July, 2015, Delft and The Hague, the Netherlands.</i> pp. 11","AutID":164725,"MonDate":null,"AnaDate":2015,"PeerRev":0,"outputType":"6_Abstr","OpenAcc":1}]},"urls":null,"spcols":[{"SpColID":51,"SpName":"Governance and law","ShortName":"Bestuurskunde en recht"},{"SpColID":45,"SpName":"Safety","ShortName":"Veiligheid"},{"SpColID":27,"SpName":"ScheldeMonitor","ShortName":"scheldemonitor"}],"thesterms":null,"taxterms":null,"pub":1,"newses":{"SesID":37434,"LoginName":"VLIZ2000\\ruthv","LoginID":79,"DD":"2009-06-25"},"updses":{"SesID":37434,"LoginName":"VLIZ2000\\ruthv","LoginID":79,"DD":"2009-06-25"},"urlmaps":[],"resmessage":"no id specified","complete":1}
