Document of bibliographic reference 357901

BibliographicReference record

Type
Bibliographic resource
Type of document
Reports
BibLvlCode
MS
Title
Eastern Green Link 2 - Marine Scheme: Appendix 8.3 - Marine Protected Area and Marine Conservation Zone Assessment
Abstract
National Grid Electricity Transmission (NGET) and Scottish Hydro Electric Transmission (SHE Transmission) are jointly developing proposals for a subsea High Voltage Direct Current (HVDC) Link between Sandford Bay in Peterhead and Fraisthorpe Sands in Bridlington, referred to as the EasternGreen Link 2 (hereafter referred to as ‘the Project’) (see Environmental Appraisal Report (EAR) Volume 2 Chapter 2: Project Description). NGET and SHE Transmission will be submitting Marine Licence applications (MLAs) to the Marine Scotland Licensing Operations Team (MS-LOT) and the Marine Management Organisation (MMO) for the marine elements of the Project between Mean High Water Springs (MHWS) at Sandford Bay and MHWS at Fraisthorpe Sands; these elements are referred to as the ‘Marine Scheme’.
Bibliographic citation
(2022). Eastern Green Link 2 - Marine Scheme: Appendix 8.3 - Marine Protected Area and Marine Conservation Zone Assessment. Environmental Appraisal Report, 3. AECOM UK Limited: Edinburgh. 27 pp.
Topic
Marine
Access rights
open access
Is accessible for free
true

Document metadata

date created
2022-10-26
date modified
2022-10-26