Skip to main content

IMIS

[ report an error in this record ]basket (0): add | show Print this page

Project management with dynamic scheduling - Baseline scheduling, risk analysis and project control
Vanhoucke, M. (2012). Project management with dynamic scheduling - Baseline scheduling, risk analysis and project control. Springer Berlin Heidelberg: [s.l.]. ISBN 978-3-642-25174-0. 310 pp. http://dx.doi.org/10.1007/978-3-642-25175-7

Author  Top 
  • Vanhoucke, M.

Content

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Author