one publication added to basket [138367] | Opvolging aanslibbing Deurganckdok: flow atlas Deurganckdok, 2/'05 - 3/'08
International Marine and Dredging Consultants; WL | Delft Hydraulics (2009). Opvolging aanslibbing Deurganckdok: flow atlas Deurganckdok, 2/'05 - 3/'08. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. II, 82 pp. | |
Available in | Authors | | Document type: Project report
|
Keywords | Data processing Flow charts Hydraulics and sediment > Hydrodynamics > Current velocities and patterns Hydraulics and sediment > Hydrodynamics > Density currents Hydraulics and sediment > Sediment > Cohesive sediment In-situ measurements Methodology Sedimentation Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions]
|
Project | Top | Authors | - Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing, more
|
Authors | | Top | - International Marine and Dredging Consultants, more
- WL | Delft Hydraulics, more
| | |
|