one publication added to basket [228882] | General evaluation
De Beukelaer-Dossche, M. (2013). General evaluation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 129-133 In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more | |
Author | | Top | - De Beukelaer-Dossche, M., more
| | |
Abstract | The creation of the Bergenmeersen flood control area with controlled reduced tide (FCA-CRT) was a major operation. To learn lessons from the project with a view to future large-scale projects, the path followed was thoroughly evaluated. Despite various unforeseen circumstances, the high level of involvement of the local community and even one or two conflicts of interest, the partners involved succeeded in cooperating flexibly and efficiently. In this way the Bergenmeersen project developed into a socially valuable project, without tampering with the vision defined at the outset. |
|