Second towing tank: towing carriage: sub report 1. Design criteria
Delefortrie, G.; Lataire, E.; Geerts, S.; Peeters, P.; Mostaert, F. (2017). Second towing tank: towing carriage: sub report 1. Design criteria. version 4.0. FHR reports, 16_107_1. Flanders Hydraulics Research: Antwerp. VIII, 26 pp.
Part of: FHR reports. Flanders Hydraulics Research: Antwerp, more

Available in  Authors 
Document type: Project report

Keywords
    Containers > Tanks > Towing tanks
    Control
    Harbours and waterways > Ship equipment > Other
    Physics > Mechanics > Dynamics
    Physics > Mechanics > Kinematics
Author keywords
    Towing carriage

Project Top | Authors 
  • Ontwerp sleepwagen 2, more

Authors  Top 

Abstract
    On September 30, 2016, the Flemish government approved the construction of the Flanders Maritime Laboratory. The construction of the Flanders Maritime Laboratory started on February 27, 2017. Among other installations, this laboratory will have a towing tank. The purpose of this document is to outline the design criteria of the towing carriage which will be used in the new towing tank.