Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [295528]
Environmental impact assessment process for deep-sea mining in 'the Area'
Durden, J.M.; Lallier, L.E.; Murphy, K.; Jaeckel, A.; Gjerde, K.; Jones, D.O.B. (2018). Environmental impact assessment process for deep-sea mining in 'the Area'. Mar. Policy 87: 194-202. https://dx.doi.org/10.1016/j.marpol.2017.10.013
In: Marine Policy. Elsevier: UK. ISSN 0308-597X; e-ISSN 1872-9460, more
Peer reviewed article  

Available in  Authors 

Keyword
    Marine/Coastal

Authors  Top 
  • Durden, J.M.
  • Lallier, L.E., more
  • Murphy, K.
  • Jaeckel, A.
  • Gjerde, K.
  • Jones, D.O.B.

Abstract
    Environmental Impact Assessment (EIA) is key to the robust environmental management of industrial projects; it is used to anticipate, assess and reduce environmental and social risks of a project. It is instrumental in project planning and execution, and often required for financing and regulatory approval to be granted. The International Seabed Authority currently requires an EIA for deep-sea mining (DSM) in areas beyond national jurisdiction (the Area), but the existing regulations present only a portion of a robust EIA process. This article presents an ideal EIA process for DSM, drawing upon the application of EIA from allied industries. It contains screening, scoping and assessment phases, along with the development of an environmental management plan. It also includes external review by experts, stakeholder consultation, and regulatory review. Lessons learned from application of EIA elsewhere are discussed in relation to DSM, including the integration of EIA into UK domestic law, and the reception of EIAs prepared for seabed ore extraction in the Exclusive Economic Zones of New Zealand and Papua New Guinea. Finally, four main challenges of implementing the EIA process to DSM in the Area are presented: 1) EIA process for DSM needs to incorporate mechanisms to address uncertainty; 2) detailed requirements for the ETA process phases should be made clear; 3) mechanisms are needed to ensure that the EIA influences decision making; and, 4) the ETA process requires substantial input and involvement from the regulator.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors