Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [305472]
MAST III - The optimisation of crest level design of sloping coastal structures through prototype monitoring and modelling (OPTICREST) - contract number MAS3-CT97-0116: annual report (12 months) a. Full progress report MAS03/797
De Rouck, J.; Verdonck, R. [s.d.]. MAST III - The optimisation of crest level design of sloping coastal structures through prototype monitoring and modelling (OPTICREST) - contract number MAS3-CT97-0116: annual report (12 months) a. Full progress report MAS03/797. University of Ghent: Ghent. 4 vol. (text, annexen I-VII) pp.

Available in  Authors 
Document type: Project report

Authors  Top 
  • De Rouck, J., more
  • Verdonck, R.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors