Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ] Print this page

Force estimation on a new coastal structure in marina Blankenberge

Funder identifier: WL 17_030 (Other contract id)
Period: July 2017 till September 2017
Status: Completed
 Institutes | Publication 

Institutes (2) Top | Publication 
  • Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Waterbouwkundig Laboratorium (WL), more, executant
  • Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Maritieme Dienstverlening en Kust; Afdeling Kust; Kust, more, proposer

Abstract
Coastal division needs a calculation of forces for a new coastal structure in the marina of Blankenberge. The calculation will be conducted by DualSPHysics since similar practice was applied to the project 13_082 stormmuren jachthaven Blankenberge.

Publication Top | Institutes 
  • Altomare, C.; Dan, S.; Suzuki, T.; Peeters, P.; Mostaert, F. (2017). Force estimation on a new coastal structure in Blankenberge: SPH modelling. Version 2.0. FHR reports, 17_030_1. Flanders Hydraulics Research: Antwerp. VI, 11 pp., more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Institutes | Publication