Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Renovation of Van Cauwelaert lock (port of Antwerp, Belgium): special design considerations for the new rolling gates
Hermans, I.P.; De Cock, W. (2008). Renovation of Van Cauwelaert lock (port of Antwerp, Belgium): special design considerations for the new rolling gates, in: The Proceedings of the International Navigation Seminar following PIANC AGA 2008. pp. 496-502
In: (2008). The Proceedings of the International Navigation Seminar following PIANC AGA 2008. China Communications Press[s.l.]. ISBN 978-7-114-07129-4. 715 pp., more

Available in  Authors 
Document type: Conference paper

Keywords
    Maintenance and repair
    Belgium, Zeeschelde, Antwerp Harbour, Van Cauwelaert Lock [Marine Regions]

Authors  Top 
  • Hermans, I.P.
  • De Cock, W., more

Abstract
    In the port of Antwerp (Flanders, Belgium), the almost 80 year old Van Cauwelaert lock (1928)is now due for a major overhaul. Renovation works will primarily include replacement of theoriginal (!) steel rolling gates (wagon type, operated by a mechanical truck) by new wheelbarrowtype gates together with all their gearing and auxiliary equipment. This first part of this paper gives an overview of the different works to be carried out in this renovation project.

    Due to the boundary conditions of the increased safety water level to retain and the dimensionsof the existing concrete structure (limited width of gate recesses!), special considerations arenecessary in designing the new lock gates (rolling gates, wheelbarrow type). In the second part ofthis paper some comments are given on this particular issue.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors