Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

3D slibtransportmodel Zeeschelde: scenario 8: effect CDW op sedimentatie Deurganckdok, volledig Deurganckdok
van Maren, B. (2011). 3D slibtransportmodel Zeeschelde: scenario 8: effect CDW op sedimentatie Deurganckdok, volledig Deurganckdok. Versie 2.0. Delft Hydraulics: Delft. 54 pp.

Available in  Authors 
Document type: Project report

Keywords
    Anchorages > Harbours
    Numerical models
    Sedimentation
    Transport > Sediment transport
    Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions]
    Brackish water
Author keywords
    Current deflecting wall (CDW)

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken (DMOW), more


Authors  Top 
  • van Maren, B., more
  • Vanlede, J., revisor, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors