Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Introduction
Decleyre, D.; De Beukelaer-Dossche, M. (2013). Introduction, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 7-8
In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more

Available in  Authors 

Authors  Top 
  • Decleyre, D., more
  • De Beukelaer-Dossche, M., more

Abstract
    Bergenmeersen is one of the subsectors of the Kalkense Meersen Cluster, which in turn forms part of the updated Sigma Plan. This plan is an update of the original 1977 Sigma Plan, and is an ambitious project to improve water safety and nature around the tidal rivers of Flanders.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors