Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Work package 5 “Measures”. Dredging and disposal strategies: Schelde estuary
(2013). Work package 5 “Measures”. Dredging and disposal strategies: Schelde estuary. MOW: [s.l.]. 11 + maps pp.

Available in

Keywords
    Marine/Coastal; Brackish water; Fresh water

Project Top 
  • TIDE - Tidal River Development, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top