Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Monitoring of the AMORAS underwater cell
De Maerschalck, B.; Van Esbroeck, M.; Ides, S.; Plancke, Y.; Claeys, S. (2015). Monitoring of the AMORAS underwater cell, in: E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands. pp. [1-4]
In: (2015). E-proceedings of the 36th IAHR World Congress 28 June – 3 July, 2015, The Hague, the Netherlands. IAHR: [s.l.]. , more

Available in  Authors 
Document type: Conference paper

Author keywords
    Port maintenance; Underwater cells; Dredged sediments

Authors  Top 
  • De Maerschalck, B., more
  • Van Esbroeck, M., more
  • Ides, S., more

Abstract
    Since end of 2011 maintenance dredging material from the port of Antwerp is mechanically dewatered by the AMORAS dewatering installation. Before the dredged material is pumped to the AMORAS site, it is temporally stored in an underwater storage cell in one of the port shelter-docks, specially constructed for the AMORAS project. The material is dumped into the underwater cell by split hopper barges. The presented paper investigates the mechanisms of potential sludge spill from the underwater cell back into the main port navigation channel.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors