Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Ondersteuning ontwerp stuwsluis Denderbelle: bundeling memo's deelopdrachten (DO) 1, 2, 6, 8 en 12
Boey, I.; Verelst, K.; Verwaest, T.; Mostaert, F. (2017). Ondersteuning ontwerp stuwsluis Denderbelle: bundeling memo's deelopdrachten (DO) 1, 2, 6, 8 en 12. Versie 3.0. WL Rapporten, 15_062_2. Waterbouwkundig Laboratorium: Antwerpen. XI, 64 pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    Locks (Waterways)
    Numerical modelling
    Renewal
    Shipping
    Structures > Hydraulic structures > Barrages > Weirs
    Water management > Hydraulics > Hydrodynamic models
    Belgium, Dender R., Denderbelle [Marine Regions]

Project Top | Authors 
  • Ondersteuning ontwerp stuwsluis Denderbelle, more

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Bovenschelde, more


Authors  Top 

Abstract
    Bij het ontwerp en de bouw van de nieuwe stuwsluis van Denderbelle was er een diverse ondersteuning noodzakelijk door het Waterbouwkundig Laboratorium voor verschillende studieaspecten. Het geheel van het studiepakket werd opgedeeld in deelopdrachten. Een aantal van deze opdrachten werden ingediend als memo, een ander deel als reeds volwaardige rapporten.

    Dit rapport bundelt een reeks van 5 reeds ingediende en door WenZ goedgekeurde memo’s in 1 rapport om zo een duidelijke rapportage en archivering mogelijk te maken.


All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors