Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Slim stuwen – fase 1: debietschommelingen op de Leie te Menen
Vanderkimpen, P.; Pereira, F.; Mostaert, F. (2018). Slim stuwen – fase 1: debietschommelingen op de Leie te Menen. Versie 4.0. WL Rapporten, 17_045_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 29 pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    In-situ measurements
    Structures > Hydraulic structures > Barrages > Weirs
    Water management > Water quantity > Water system knowledge
    Belgium, Leie R., Menen [Marine Regions]
Author keywords
    Deûle; Lys

Project Top | Authors 
  • Slim stuwen (fase 1), more

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Bovenschelde, more


Authors  Top 

Abstract
    Op de Leie doen zich vanaf de grens met Wallonië en Frankrijk grote debietschommelingen voor, zelfs bij droog weer. Deze studie heeft tot doel de oorzaken van deze debietschommelingen te identificeren en oplossingen te zoeken om deze debietschommelingen op korte termijn zo veel mogelijk te voorkomen of te dempen. Uit de analyse blijkt dat de debietschommelingen vermoedelijk onstaan en versterkt worden in Frankrijk en Wallonië. De stuw van Menen lijkt geen grote rol te spelen in dit proces. Om de oorzaken van de debietschommelingen weg te nemen is intergewestelijke en internationale samenwerking dan ook noodzakelijk. Om de debietschommelingen te kunnen dempen in Vlaanderen zijn bijkomende bergingsvoorzienigen langsheen de Leie nodig.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors