Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (1): add | show Print this page

Integraal Plan Boven-Zeeschelde: sub report 13. Implementation of C alternatives
Bi, Q.; Smolders, S.; Vanlede, J.; Mostaert, F. (2020). Integraal Plan Boven-Zeeschelde: sub report 13. Implementation of C alternatives. Version1.0. FHR reports, 13_131_13. Flanders Hydraulics Research: Antwerp. 54 + 12 p. app. pp.
Part of: FHR reports. Flanders Hydraulics Research: Antwerp, more

Available in  Authors 
Document type: Project report

Keywords
    Numerical modelling
    Physics > Mechanics > Fluid mechanics > Hydrodynamics
    Water management > Hydraulics > Hydrodynamic models
    ANE, Scheldt Estuary [Marine Regions]
Author keywords
    Scaldis-model; Telemac

Project Top | Authors 
  • Vervolgonderzoek Bevaarbaarheid BoZS (Integraal Plan BoZs), more

Authors  Top 

Abstract
    This report details the implementation of the C alternatives in the Scaldis model. The definition of the C alternatives has three variations (C1 to C3), which have been described briefly in the memo ‘Towards the definition of C alternatives’ (IMDC, 2019) which has been discussed with international experts (EGIPUS) in a workshop 18th June 2019.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors