Skip to main content

IMIS

A new integrated search interface will become available in the next phase of marineinfo.org.
For the time being, please use IMIS to search available data

 

[ report an error in this record ]basket (0): add | show Print this page

Design guidelines versus practices for the Upper Sea Scheldt, the inland waterway connection between Antwerp and Ghent
Eloot, K.; Vantorre, M.; Adams, R.; Bosmans, S.; De Beukelaer-Dossche, M. (2015). Design guidelines versus practices for the Upper Sea Scheldt, the inland waterway connection between Antwerp and Ghent, in: SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet. pp. paper 99 (12 p.)
In: (2015). SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet. PIANC: Brussels. , more

Available in  Authors 
Document type: Conference paper

Keywords
    Accessibility
    Design
    Guidelines
    Inland waterways
    Belgium, Zeeschelde [Marine Regions]

Authors  Top 
  • Bosmans, S.
  • De Beukelaer-Dossche, M., more

Abstract
    Design guidelines for inland waterways are so far a national matter. PIANC InCom Working Group 141 "Design Guidelines for Inland Waterways" is nevertheless working on a report with a summary of existing guidelines and a methodology for the concept and detailed design of canals and rivers. For tidal rivers the design is a difficult process and an example is given through the accessibility of the Upper-Seascheldt for CEMT class IV and Va inland vessels between the port of Antwerp and the locks in Merelbeke. A combined evaluation based on concept design guidelines for canals, practices measured during a full-scale voyage and detailed design using ship handling simulators is discussed and illustrated.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors